Outdoor space of a prefab ADU with plantsDue to the increasing house prices, California is facing a major issue of housing underproduction. This has made ADU installations a popular trend in the state.

This second unit can be constructed and set up at a house to enhance property value and functionality.

However, transporting a prefab ADU is a complex process that requires careful planning and execution. With people seeking affordable small homes in Sonoma County, CA, understanding the details of manufactured home transport is increasingly important.

Knowing what to expect can help ensure a smooth transition. So, let’s find out.

1. Pre-Transport Preparation

i. Site Assessment and Permits

Before any transport can occur, assess the new site where the home will be placed. Ensure that the site is prepared, including foundation work, utility connections, and compliance with local zoning laws.

In Sonoma County, this often means securing permits and ensuring that the foundation meets the necessary codes for manufactured home installation.

ii. Choosing a Company

Select a reputable company specializing in manufactured home transport. Look for one with experience in moving custom small homes and handling all logistical details. Check their credentials, read reviews, and ensure they offer insurance coverage for the move.

Sonoma Manufactured Homes offers a smooth and hassle-free transport experience. We move an ADU to a new property or transport a manufactured home from the factory to your site,

iii. Preparing the Home

Before transport, the manufactured home must be prepared. This includes securing all loose items inside the home, disconnecting utilities, and ensuring that the home is properly disassembled if necessary. The Sonoma Manufactured Homes will handle this, but clear communication with them is crucial.

An empty bathroom of a custom small home

2. The Transport Process

i. Loading the Home

Loading the manufactured home onto the transport vehicle is a critical step. This typically involves using heavy-duty equipment like cranes or hydraulic lifts.

The company should have the right equipment and experienced staff to handle this delicate task.

ii. Transporting the Home

The journey to the new site requires careful navigation. The company will plan the route, considering road restrictions, traffic conditions, and potential obstacles.

They may need to secure permits for oversized loads and coordinate with local authorities to manage road closures or traffic disruptions.

For delivery and installation, Sonoma Manufactured Homes needs a level piece of land, a path that is 14 feet wide, and a 15-foot overhead clearance.

iii. Monitoring the Transport

During transport, it’s essential to stay in contact with the company. They should provide regular updates on the home’s location and estimated arrival time. This will help you stay informed and prepare for the next steps.

3. Arrival and Installation

i. Site Preparation

Upon arrival, the site must be ready to receive the manufactured home. This includes ensuring that the foundation is level and that utility connections are in place. The company will typically perform a final inspection to confirm that everything is in order.

ii. Unloading and Placement

Unloading the home involves carefully positioning it on the foundation. This requires precise alignment and leveling to ensure the home is stable and secure. The company will use specialized equipment to place the home accurately.

iii. Final Adjustments

Once the home is in place, final adjustments are necessary. This includes reconnecting utilities, inspecting the home for any damage that may have occurred during transport, and making sure that everything is operational. If any issues arise, address them promptly to avoid delays.

Kitchen of a custom small home

4. Post-Transport Considerations

i. Inspection and Final Touches

After installation, perform a thorough inspection of the manufactured home. Check for any damage and ensure that all systems are functioning correctly. Address any issues with the installation team immediately.

ii. Setting Up the Home

Finally, it’s time to set up your new home. This involves moving furniture, decorating, and making any additional modifications to tailor the home to your preferences.

A shelf counter, chairs, table, and sofa, with rugs in a prefab ADU

If you’re installing small homes or ADUs, ensure that all necessary manufactured home permits and inspections are completed to meet local regulations.

iii. Maintaining Communication

Maintain communication with the company for any post-transport support or warranty issues. Their assistance can be valuable in resolving any problems that arise after the move.

Sonoma Manufactured Homes — Offering Manufactured Home Transportation For Prefab ADU

Trust Sonoma Manufactured Homes to manage your project with expertise and care. Although we can deliver on-site services to Petaluma, CA, within around an hour, our crew is prepared to drive up to two hours for custom small home installations in Sonoma County. Our expert team handles everything from permits to final occupancy.

For reliable, efficient, and comprehensive services, reach out to us today or call us at 415-233-0423 to discuss your transport needs and let us handle the rest.